• 24
    01,2024
    On January 23, Beijing Energy International’s 13.8MW/27.6MWh user-side energy storage project in Lanjun, Jiashan County, Jiaxing City, Zhejiang Province was smoothly registered. This project is the first of its kind registered by the company in Zhejiang, which has played a good demonstration role for developing user-side energy storag...
  • 24
    01,2024
    On January 24, the 6MW Lin-gang COSCO Container Lines distributed photovoltaic project of Beijing Energy International in Shanghai Pudong New Area was smoothly connected to power grid at full capacity. This is the largest single distributed photovoltaic project invested and constructed by the company in Shanghai. The project is located ...
  • 24
    01,2024
    Recently, Beijing Energy International smoothly completed the registration of Guoxuan Battery Integrated Energy Project in Lubei District, Tangshan, Hebei Province, marking yet another achievement of the company in promoting the coordinated development of Beijing-Tianjin-Hebei Region. The project is located in the factory area of Tangshan...
  • 24
    01,2024
    On January 24, Zhang Ping, chairman of the Board of Directors of Beijing Energy International, met with Wang Lixun, the county magistrate of Kangping County, Shenyang City, Liaoning Province, and the two sides exchanged on in-depth cooperation in the field of new energy.  At the meeting, Zhang Ping welcomed Wang Lixun and introduce...
  • 24
    01,2024
    On January 23, Zhang Ping, chairman of the Board of Directors of Beijing Energy International Holdings, met with Tian Xingmin, mayor of Gaoyou Municipal Government in Yangzhou, Jiangsu Province in Beijing. The two sides exchanged on in-depth cooperation in the field of clean energy. At the meeting, Zhang Ping welcomed Tian Xingmin an...
  • 23
    01,2024
    On January 22, Beijing Energy International organized a scheduling meeting of Tongliao 2.38 million kilowatts wind power base project in Tongliao City, Inner Mongolia. Xuan Dongsheng, deputy mayor of Tongliao, Batu, director of Energy Bureau, Li Qingdong, deputy director of Municipal Government Office, and Shi Jiageng, director of Nat...
  • 19
    01,2024
    On January 19, Jia Geng, vice president of Beijing Energy International, met with Xu Fei, deputy chief engineer of Shanghai Electric Guoxuan New Energy Technology Co., Ltd. in Beijing. The two sides held in-depth exchanges on promoting cooperation in the fields of new energy and energy storage. Sun Chuanxiang, senior consultant of Shang...
  • 19
    01,2024
    On January 18, Huang Hui, vice president and CFO of Beijing Energy International, met with Dai Yan, deputy general manager of the Investment Banking Department of China Merchants Bank in Beijing. The two sides had an in-depth exchange on finance business cooperation in the field of green energy. Ke Xudong, general manager, and Jiao Ya...
  • 16
    01,2024
    On January 15, the 50MW agrophotovoltaic project in Orchid Base, Wengyuan County, Shaoguan, Guangdong was smoothly registered. This marks another achievement of the company in developing new energy projects in northern Guangdong around the strategy of energy structure transformation and rural revitalization, and in implementing the planning guide...
  • 15
    01,2024
    BJ ENERGY INTL Held the 2024 General Work Meeting Anchoring in the Goal, Reaching the Peak and Drawing A New Blueprint for High-quality Development The 2024 General Work Meeting of BJ ENERGY INTL On January 13, Beijing Energy International Held the 2024 General Work Meeting in Beijing. Chairman Zhang Pin...