On January 5, 2024, the 2.5317MW distributed photovoltaic project of Luoshan County Prison in Xinyang, Henan Province was smoothly connected to the grid for power generation, which is the company’s first distributed photovoltaic project connected to power grid within Henan’s public organs.
The project is located in the prison area of Xinyang, Henan, with an installed capacity of 2.5317MW, and the project can supply electricity for its self-use, with the surplus connecting to the grid. After it is launched into operation, it is estimated that the annual production of green electricity is about 2.66 million kWh, equivalent to saving about 616 tons of standard coal and reducing about 2,553 tons of carbon dioxide emissions every year, which provides a strong support for the prison system in Henan to actively carry out low-carbon energy conservation and build a resource-saving prison system.