The Longi Photovoltaic Power Station is located in Xiuzhou District, Jiaxing City, Zhejiang Province, with an installed capacity of 17.73 MW. It is the first BIPV project integrating photovoltaic energy and buildings, implemented by a state-owned enterprise of Beijing. The power station breaks the traditional construction mode of “installing PV systems in existing building” by directly taking photovoltaic modules as an organic part of the building, such as the “PV modules as roof” to supply power for buildings. It fully utilizes the rooftop resources of Le Ye Photovoltaic Module Factory in Longi, Jiaxing, with a rooftop area of about 110,000 square meters, and adopts Longi New Energy’s leading BIPV product—the LONGi Roof. It has an average annual power generation of 18 million kWh, which will provide 430 million kWh of clean energy for the power grid in the next 25 years, equivalent to saving 129,600 tons of standard coal and reducing about 404,900 tons of carbon dioxide emissions, and it strives to achieve the perfect integration of green building materials and high performance of power generation.