The Huaru Photovoltaic Power Station is located in Taobei District, Baicheng City, Jilin Province, with an installed capacity of 15 MW. It covers an area of 606.55 mu (around 40 hectares) with a total investment of 110 million yuan. The project was fully connected to the power grid on June 30, 2018, with an annual power generation of 18,572,850 kWh, which can reduce carbon dioxide emissions by 15,500 tons and save coal resources by 5,700 tons. It strives to reduce the pollution caused by equipment to the environment, so that people and nature can coexist harmoniously and clean electric energy can be used to build a better society.